TEE SECTION DRILLED + SNIPED
Structural tee section 200 metres of structural tee supplied sawn to length, drilled and stalk sniped at 45 degrees
Structural tee section 200 metres of structural tee supplied sawn to length, drilled and stalk sniped at 45 degrees
Temporary Steelwork SC4 produced and supplied 2200 tonnes of temporary steelwork consisting of props and wailing beams weighing 30 tonnes each for bouygues tyne tunnel project
25 Tonnes of fabricated steelwork for a client’s project, supplied painted and delivered to site in a 2 week schedule
50 Tonnes of steelwork for a client’s project, supplied fabricated galvanised and delivered to site in a 3 week schedule. .
50 Tonnes of steelwork for a client’s project, supplied fabricated painted and delivered to site in a 2 week schedule
50 Tonnes of structural steel supplied, fabricated, painted and delivered to site for one of the distributors, 3 weeks from order being placed the materials were on site and erected.
SC4 have provided 150 tonnes of fabricated, structural columns for the rebuild of London’s Farringdon Station.
Utilising phase-specific ordering, SC4 have delivered over 4000 tonnes of steel to the Jaguar Land Rover (JLR) expansion project.